Gandhav Flyover
Grade separator flyover improving traffic flow at a major highway junction, easing congestion on high-traffic corridors.
The Railway Over Bridge at chainage 0+100 is a critical infrastructure project delivering a reinforced earth approach, PSC girder superstructure, and integrated retaining works. Chetan Engineers is executing foundation piling, pier construction, pier cap reinforcement, PSC girder shuttering, and multi-lift structural works to ensure safe rail corridor connectivity.
Construction of a Railway Over Bridge including reinforced earth (RE) wall friction slabs, pier and pier cap works, PSC girder casting and shuttering, multi-lift pier construction, and associated structural steel reinforcement across the 0+100 chainage.
Grade separator flyover improving traffic flow at a major highway junction, easing congestion on high-traffic corridors.
Eight-lane access-controlled expressway reducing the distance between Delhi and Mumbai by approximately 220 kilometres,…
The New Narmada Bridge is a 1,344 m extradosed bridge constructed at Bharuch on NH-8, running parallel to Sardar Bridge…